A flow of the dismantling construction

1. An inquiry

Please teach the structure of an address and the building of the dismantling construction spot, an area (acreage).
Calculation

2. A field work

Building structure classification and demolition work environment, neighborhood environment, import export route confirmation, the demolition work heavy industrial machine vehicle choice

3. An estimate

I give an explanation about expense and a dismantling method to depend on dismantling construction.

4. A contract contract

5. A report based on construction Law for the Promotion of Utilization of Recycled Resources

※The construction Law for the Promotion of Utilization of Recycled Resources is the law that was established to promote the classification recycling (recycling) of the industrial waste which occurred by the building dismantling.
A report is obliged the case more than 80m2 to the floor space of the building to dismantle.

[ The recycling of the industrial waste which occurred by the dismantling (Recycling) ]
* Metal > Iron manufacture raw materials
* Concrete > Rubble, Asphalt
* A plasterboard > A plasterboard
* A small piece of wood > A fuel tip, Chipboard
* Plastic > Plastic reproduction raw materials
* Glass, Ceramics > Ceramics reproduction raw materials

6. Neighborhood greetings

We explain greetings and a dismantling construction summary, a work process,
an urgent address to the people of the dismantling construction spot neighborhood.

7. The dismantling construction start of construction

In the inside, we give a perfect response by the on-site work environment and situation for a dismantling construction period.

[ An anti-noise measure ]
Soundproofing sheet, soundproofing panel good self-care, low noise type heavy industrial machine use
[ An anti-vibration measure ]
The operation that I do not bet surplus load on, a heavy industrial machine low speed run
[ An anti-protection against dust measure ]
watering, flame proofing sheet
[ Safety measures ]
Everyday KY activity, useing safe obi, guard security

8. Export

We separate the industrial waste which occurred by dismantling construction and
carry it out to an intermediate processing institution.

9. Manifesto slip making

I do how the industrial waste which went out of the dismantling construction spot was processed to
documents to prevent the illegal dumping of the industrial waste with the manifesto slip.
A save of five years is obliged it to.

10. Completion of the dismantling construction

We have you do dismantling construction of spot confirmation after being completed.

11. The registration to lose a building

You go to the nearest judicial scrivener and I demolish a house and attach a certificate and
have to perform the registration to lose a building.